Client: Municipality of Rijeka
Architect: Studio Zoppini
Cost: Euro 12 million
Completed: 2008
Design for the new 50m. Indoor swimming pool and renovation of the existing outdoor swimming pool. The project includes also the urban design of 800m coast to be developed as a ricreational and sports area.